Cardiac and Pulmonary Diagnostics and Exercise (Stress) Testing Solutions
Overview
This framework starts on 27 July 2026, runs for 24 months and ends on 26 July 2028. There is an option to extend for an additional 24 months.
This replaces the former Cardiac Diagnostics Equipment Technologies and Related Equipment and Services framework.
There are 25 suppliers, including 8 new suppliers, on the framework offering more choice to customers. See the Suppliers section for a full list of suppliers on this framework.
Areas covered
There are three lots on this framework (see Product Categories section for a full list).
See our Downloads ▼ section for the full range of products on the product matrix.
Resilience
Our increased knowledge of the global manufacturing base following COVID-19 and subsequent global supply challenges means we are better able to identify potential risks and mitigate them by building resilience into our sourcing strategies.
For this framework we are adopting measures including requesting Cyber Essentials Plus accreditation.
How to purchase from the framework
This is a direct framework agreement. To order products:
- Customers will need to obtain a quotation through our Category team, or via the supplier direct.
- Quotes will be validated by the Electrocardiograph (ECG) team, and a Unique Reference Number (URN) will be provided which will need to be quoted on your purchase to order from the supplier.
- If you are interested in further information, please contact the ECG team via email at:
Electrocardiograph (ECG) Team
Ordering samples
Product samples are not available on this framework.
Savings Opportunities
The framework will support mini competitions for all Cardiac and Pulmonary Diagnostics and Exercise (Stress) Testing Solutions for further savings. If you are interested in further information, please contact Cardiac and Pulmonary Diagnostics and Exercise (Stress) Testing Solutions team to find out more via email at:
Electrocardiograph (ECG) Team
When purchasing from this framework you may be able to take advantage of additional savings opportunities through:
- Volume banding and commitment deals
- MTA (Multi-Trust Aggregation).
See our Useful Links section to find out more about these opportunities.
Sustainability and Social Value
Sustainability, net zero and social value are important elements in how NHS Supply Chain build our framework offering through the procurement process, tendering, supplier award and contract management. There are four mandatory requirements for suppliers to address supporting compliance with relevant PPNs and NHS England policy.
- Carbon Reduction Plan (PPN 006)
- Evergreen Assessment
- Modern Slavery Assessment (PPN 009)
- Social Value (PPN 002).
Awarded suppliers meet the current milestones on the net zero roadmap and have awareness and understanding of future milestones.
Social value
See our Downloads▼ section for further information on suppliers’ social value commitments.
Sustainable opportunities
The following sustainable opportunities are available on this framework:
Pathways – Remote diagnostic and interpretation services may support home-based monitoring pathways, improving patient convenience, reducing the need for appointments where clinically appropriate, and enabling earlier access to diagnostic services.
Equipment lifecycle and circular economy – Suppliers may offer equipment lifecycle management solutions, including take-back schemes, refurbishment, redeployment, asset recovery or responsible end-of-life disposal arrangements where appropriate. These approaches can support a circular economy by extending asset life, reducing waste and improving resource efficiency.
Energy efficiency and carbon reduction – Remote interpretation services can support more efficient patient pathways by reducing the need for some face-to-face appointments and unnecessary travel where clinically appropriate, helping to reduce carbon emissions and support NHS sustainability objectives.
Consumables and supply chain – Advances in device connectivity and digital integration can enable ECG recordings to be transferred electronically into clinical systems, reducing reliance on paper-based processes and supporting more efficient use of consumables.
Digital transformation – Advances in connected monitoring technologies may support real-time remote patient monitoring, enabling clinical data to be reviewed remotely and supporting more digitally enabled models of care.
Suppliers
There are 25 suppliers on this framework. They are:
- Broomwell Healthwatch
- Cambridge Heartwear
- Cardiac Services
- CardioScan Ltd
- Cortrium ApS
- Express Diagnostics Ltd
- Fukuda Denshi UK Ltd
- GE Medical Systems Ltd
- Icentia Limited
- Intermedical (UK) Ltd
- iRhythm Technologies Ltd
- Jaeger Medical UK Limited
- LifeSignals Europe Limited
- Love Medical
- Medical Graphics UK Ltd
- Mindray UK Limited
- Numed Holdings Ltd (T/A Numed Healthcare)
- Philips Electronics UK Limited
- Schiller UK Ltd
- SECA UK Ltd
- Spacelabs Healthcare Ltd
- Technomed Ltd
- Walters Medical Ltd
- Welch Allyn Ltd
- Wiliams Medical Supplies Limited.
The following suppliers are being delisted at the start of the framework agreement:
- Aktiia SA
- Alivecor
- Ascend Care
- Bealo Co Ltd
- BHA Medical
- Braun & Company
- Cardioline S.P.A
- Cardiologic Ltd
- Dot Medical
- Edan Medical Uk
- Henry Schein UK
- Microlife Health Management
- Microport CRM UK
- Nihon Koden
- Novacor
- PMS Instruments
- Preventice Solutions
- Regents Park Healthcare
- Vitalograph
- Zenicor Medical.
Product Categories
There is an extensive list of products from a wide range of suppliers in the market.
There are three lots on this framework:
- Lot 1: Electrocardiograph (ECG) Devices and Management Systems
- Lot 2: Ambulatory Monitoring, Wearable Recorder Devices and Related Services
- Lot 3: Exercise Tolerance Testing (ETT), Cardiopulmonary Exercise Testing (CPET), and Pulmonary Function Testing (PFT) Systems and Related Products and Services.
See our Downloads ▼ section for the full list of products on the product matrix.
Key Benefits
Choice
- Leading suppliers on contract – providing enhanced range and value from a single source.
More savings
- Pay less – with NHS Supply Chain you have a wider range of product options so you can select the ones that are fit for purpose and value for money.
- Leave your tendering to us – spend less time and money on tendering and let our procurement specialists undertake it on your behalf.
- Back office savings – the efficiency of our service, ranging from e-ordering to consolidated deliveries, enables significant back office savings.
More value
- An integrated approach – the financial benefits of NHS Supply Chain go beyond just product prices. Our approach is an integrated one that reduces cost throughout the supply chain, from raw materials to global logistics, resulting in a much lower total cost.
- Purchasing through our route – when there are changes in the market, we can help minimise the impact of price rises and give support with cost saving initiatives.
Our knowledge and expertise
- Dedicated Acute team and Out of Hospital Care team – your day to day contact for all queries. They will help you identify savings opportunities, solve any issues on your behalf and ensure high service levels are always met.
- NHS Supply Chain Buyers – procurement specialists in their product fields who can give expert advice on new and alternative products.
- Implementation Team – experts in helping you set up the new processes and training required when introducing new products.
- Customer Services Team – with the daily support provided by our dedicated and knowledgeable advisors and service managers you know you are in safe hands.
- Customer Assurance – providing customers with the confidence and assurance of products using a process of clinical evaluation and engagement with clinical users. This ensures all products are clinically assured by the CaPA process, supported by engagement with customers.
Peace of mind
- Dependable deliveries – having access to the know-how and resources of one of the world’s largest logistics companies means we can offer unrivalled dependability and responsiveness when it comes to our delivery services.
- Framework agreement – awarded in accordance with UK procurement legislation.
- Sustainability – Sustainable procurement is embedded into our category management processes to ensure that our suppliers meet requirements for carbon reduction plans, evergreen assessment, modern slavery, social value and NHS England net zero supplier roadmap. Additionally, our logistics partner is certified ISO14001.
Links section
-
Capital Savings Opportunities
Ways to save on your capital equipment and other vital supply chain products.
-
Diagnostic Equipment and Services
Category information and links relating to our diagnostics equipment, services and capital equipment.
-
Acute Team
Contact details for our Acute team (ICS Managers - previously known as Customer Relationship Managers).
